Electrical Application Details for App #: Y172882
Premises: 1531 UNIVERSITY AVENUE BRONX BIN: 2092104     Block: 2877   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 1535 UNIVERSITY AV Census Tract:   205.01 Health Area:  2210
BASEMENT Admin Area:   Y - BRONX Inspection Area:   E
BRONX, NY 10453 Community Board:   205
Special Place Name:   SEDGWICK HOUSES
DOB Cross Street(s):   CROSS BRONX EP ET 1 D-1 C WB,    FEATHERBED LANE
Status:   C - JOB IS SIGNED OFF 03/23/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/29/2015 2:23 PM
Application Entered:   04/29/2015 Job Start Date:   04/30/2015
Last Change:   03/23/2016 Job End Date:   11/20/2015
Appointment Status:   
Last Inspection By:   MICHAEL QUERY       On     02/22/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011028 Licensee Name: WILLIAM NIEVES
Firm: 002945 Firm Name: CHARAN ELEC'L ENTERP'S IN
Firm Phone: 718-706-9612  Firm Address: 9-11 40TH AVENUE LONG ISLAND CITY NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $70.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MARTINEZ WILLIAM
Owner Business Name: NYCHA
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  1SET SINGLE PHASE #6AWG
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  1PANEL SINGLE PHASE MAIN
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS                       
015                       
Buildings Total                     
Total Units : 2 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  PROVIDE POWER TO LOW VOLTAGE CABINET

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y172882
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/22/2016 02/22/2016 MQY C (35) (0) Y
INSPECTION COMMENTS: 1 PANEL, 1 60AMP DISCONNECT SWITCH, 1 RECEPTACLE