BIS Menu  |  Elevators  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y169908
Premises: 2551 WESTCHESTER AVENUE BRONX BIN: 2041875     Block: 3984   Lot: 100
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 2551 WESTCHESTER AV Census Tract:   200 Health Area:  1320
SIDEWALK SHED Admin Area:   Y - BRONX Inspection Area:   I
BRONX, NY 10461 Community Board:   210
DOB Cross Street(s):   FERRIS PLACE,    EAST TREMONT AVENUE
Status:   E - ABANDONED 08/22/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  08/20/2014 4:28 PM
Application Entered:   08/20/2014 Job Start Date:   08/20/2014
Last Change:   08/22/2025 Job End Date:   08/20/2015
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 010377 Licensee Name: MICHAEL BAPTISTE
Firm: 002413 Firm Name: WCK ELECTRIC CORP.
Firm Phone: 917-909-1048  Firm Address: 1274 PROSPECT AVENUE BROOKLYN NY 11218 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   RECREATION CENTER
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: AKHLAK CHOUDHARY
Authorized Representative:  MICHAEL BAPTISTE
Relationship To Owner:   SUB-CONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND                   
Buildings Total                   
Total Units : 3 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  INSTALL POWER AND LIGHT FOR SIDEWALK SHED 30 L.F.

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER Y169908
INSPECTION FOR APPLICATION #: Y169908
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.