|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: Y164971 |
Premises: 282 EAST 205 STREET BRONX | BIN: 2018102 Block: 3341 Lot: 10 |
Printable (PDF) version of this Permit |
Filed: | 282 E 205 ST | Census Tract: 425 | Health Area: 0420 | |
3F | Admin Area: Y - BRONX | Inspection Area: H | ||
BRONX, NY 10467 | Community Board: 207 | |||
Special Place Name: NONE |
DOB Cross Street(s): BAINBRIDGE AVENUE, PERRY AVENUE | |||
Status: I - AWAITING INSPECTION REQUEST | |||
Request Type: P - PICK-UP | eFiled: YES | ||
Application Entered: 08/18/2013 | Job Start Date: 08/20/2013 | ||
Last Change: 08/18/2013 | Job End Date: 11/22/2013 | ||
COMPLETION FEE WAS BILLED |
Appointment Status: | Complaint Number: 2187437 | ||
Last Inspection By: ERROL FLYNN FRANKLIN On 07/12/2013 | |||
Field Disp: W - ISSUE OBJECTION TO OWNER | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 010904 | Licensee Name: | RYBURN PHILLIPS | |
Firm: | 002185 | Firm Name: | R.A. PHILLIPS ELEC'L CONT | |
Firm Phone: | 718-493-1670 | Firm Address: | 131 KINGSTON AVENUE BROOKLYN NY 11213 |
Work Started or Filed by Others: YES | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $40.50 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
Building Used As: L - Five Or More Family | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | SHOHIDUL MIA | ||||||
Authorized Representative: SHOHIDUL MIA | |||||||
Relationship To Owner: OWNER |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
003 | 3F | 2 | 6 | 4 | ||||||||
Buildings Total | 2 | 6 | 4 | |||||||||
Total Units : 12 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | V - OBJECTION(S) EXIST | |
Power Requested: | Notice: | 07/15/2013 | |
Power Issued: | Response: | F - FILED TO REMOVE OBJECTION 08/18/2013 |
Follow-Up: | F - FILED TO REMOVE OBJECTION 08/18/2013 | ||
Contractor's Comments: GENERAL WIRIG |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 07/12/2013 | 07/15/2013 | EFF | W | (15) | (4) | ||||
INSPECTION COMMENTS: | SEE VIOLATION DETAILS |