Electrical Application Details for App #: Y164968
Premises: 265 EAST 182 STREET BRONX BIN: 2013563     Block: 3150   Lot: 45
   
Application Completed and Certified

Filed: 265 E 182 ST Census Tract:   383.01 Health Area:  1000
BASEMENT/APARTMENTS Admin Area:   Y - BRONX Inspection Area:   I
BRONX, NY 10457 Community Board:   205
DOB Cross Street(s):   RYER AVENUE,    VALENTINE AVENUE
Status:   C - JOB IS SIGNED OFF 09/24/2014
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/15/2013 3:16 PM
Application Entered:   07/15/2013 Job Start Date:   07/17/2013
Last Change:   09/24/2014 Job End Date:   12/20/2014
Appointment Status:   
Last Inspection By:   DIMAGGIO, PHILLIP       On     04/25/2014      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 010167 Licensee Name: DELROY HENRY
Firm: 002522 Firm Name: AFFORDABLE ELECTRICAL
Firm Phone: 718-324-2623  Firm Address: 3958 BRONXWOOD AVENUE BRONX NY 10466 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $970.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: JONATHAN MALINAS
Owner Business Name: VALINTINE ASSOCIATES
Authorized Representative:  MALINAS JONHATAN
Relationship To Owner:   OWNER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  1  400
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  25  3 -#6
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  1  SET 500 MCM
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  25  20 CKT PANELS
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 26 #4-Wire 0 #10-Wire 0
Existing Meters 26 + New Meters 25 - Removed Meters 25 = Total Meters 26

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 07/15/2013 Notice:  
Power Issued: 07/15/2013 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y164968
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/10/2014 04/17/2014 PDI N (15) (0) Y
INSPECTION COMMENTS: NO ACCESS
 
(2) 04/25/2014 04/28/2014 PDI C E (90) (0) Y
INSPECTION COMMENTS: CERT




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.