Electrical Application Details for App #: Y163144
Premises: 2641 GRAND CONCOURSE BRONX BIN: 2013830     Block: 3168   Lot: 27
   

DOB NOW: Inspections


Filed: 2641 GRAND CONCOURSE Census Tract:   401 Health Area:  0900
OUSTSIDE PERIMETER Admin Area:   Y - BRONX Inspection Area:   F
BRONX, NY 10468 Community Board:   207
Special Place Name:   PS246X
DOB Cross Street(s):   EAST 193 STREET,    EAST KINGSBRIDGE ROAD
Status:   K - CLOSED/CANCELLED 02/15/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/25/2013 2:22 PM
Application Entered:   02/25/2013 Job Start Date:   02/25/2013
Last Change:   02/15/2018 Job End Date:   02/25/2014
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   PETER GREENE       On     02/15/2018      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 011268 Licensee Name: CHARLES DAMBROSE
Firm: 002818 Firm Name: STANCO SYSTEM ELEC'L CONT
Firm Phone: 718-761-7373  Firm Address: 4061 VICTORY BOULEVARD STATEN ISLAND NY 10314 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $57.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   W - School
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: KENNETH HERNANDEZ
Owner Business Name: YORK SCAFFOLDING
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND    40        40             
Buildings Total 40        40                
Total Units : 80 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  LIGHTING FOR SIDEWALK BRIDGE

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y163144
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/08/2018 02/09/2018 PGR J (10) (0) Y
INSPECTION COMMENTS: SHED STILL UP
 
(2) 02/15/2018 02/15/2018 PGR K (10) (0) Y
INSPECTION COMMENTS: RE Y179332




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.