Electrical Application Details for App #: Y159402
Premises: 1970 WALTON AVENUE BRONX BIN: 2007924     Block: 2829   Lot: 1
   
Application Completed and Certified

Filed: 1970 WALTON AV Census Tract:   241 Health Area:  1600
BASEMENT Admin Area:   Y - BRONX Inspection Area:   F
BRONX, NY 10453 Community Board:   205
DOB Cross Street(s):   EAST TREMONT AVENUE,    EAST 179 STREET
Status:   C - JOB IS SIGNED OFF 05/09/2012
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/26/2012 10:35 AM
Application Entered:   03/26/2012 Job Start Date:   03/26/2012
Last Change:   05/09/2012 Job End Date:   05/31/2012
Appointment Status:   
Last Inspection By:   ASHMAN, K.       On     04/24/2012      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011008 Licensee Name: LAURENCE H ROBIN
Firm: 001260 Firm Name: ROBIN ELECTRICAL CO., INC
Firm Phone: 718-292-6535  Firm Address: 437 EAST 165TH ST. B704 BRONX NY 10456 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ROBERT ROSENBERG
Owner Business Name: MDRJ LLC
Authorized Representative:  HESHY NEWMAN
Relationship To Owner:   BUILDING MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 03/26/2012 Notice:  
Power Issued: 03/26/2012 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SEPARATE METER FOR SUPER'S APT. RISER BY OTHERS.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y159402
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/24/2012 04/27/2012 KAS C E (50) (0) Y
INSPECTION COMMENTS: CERT