Electrical Application Details for App #: Y157519
Premises: 2455 GRAND AVENUE BRONX BIN: 2014636     Block: 3213   Lot: 40
   

DOB NOW: Inspections


Filed: 2455 GRAND AV Census Tract:   263 Health Area:  0320
1ST FL Admin Area:   Y - BRONX Inspection Area:   F
BRONX, NY 10468 Community Board:   207
Special Place Name:   STREET
DOB Cross Street(s):   WEST FORDHAM ROAD,    WEST 188 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   P - PICK-UP eFiled:   NO
Application Entered:   09/28/2011 Job Start Date:  
Last Change:   08/22/2025 Job End Date:  
Appointment Status:   
Last Inspection By:   BANYA, E       On     08/13/2011      
Field Disp:   W - ISSUE OBJECTION TO OWNER
Energize Recommendation:  
Objection Disposition:  

License #: Licensee Name: UNKNOWN
Firm: Firm Name: UNKNOWN
Firm Phone:   Firm Address:  

Work Started or Filed by Others: NO
Work Category:    Work To Be Done:   Total Fee:  $0.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   A - One Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: ELLEN MATZ
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 09/28/2011
Power Issued: Response:  

Follow-Up: V - OWNER OBJECTION 09/28/2011
Contractor's Comments:  SIDEWALK SHED

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y157519
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/13/2011 09/28/2011 EBA W (20) (1)
INSPECTION COMMENTS: GFCI NOT PROVIDED FOR SHED LIGHTS

OBJECTION FOR APPLICATION #: Y157519
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
NO GFCI PROTECTION FOR SHED LIGHTS
OPEN 08/13/2011 08/13/2011