BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y156339
Premises: 3010 VALENTINE AVENUE BRONX BIN: 2017215     Block: 3307   Lot: 7
   
Application Completed and Certified

Filed: 3010 VALENTINE AV Census Tract:   413 Health Area:  0420
APT B Admin Area:   Y - BRONX Inspection Area:   H
BRONX, NY 10458 Community Board:   207
DOB Cross Street(s):   EAST 201 STREET,    EAST 202 STREET
Status:   C - JOB IS SIGNED OFF 08/03/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/27/2011 6:51 AM
Application Entered:   06/27/2011 Job Start Date:   06/27/2011
Last Change:   08/03/2011 Job End Date:   06/30/2011
Appointment Status:   
Last Inspection By:   BANYA, E       On     07/14/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012066 Licensee Name: WILFREDO COLON, JR
Firm: 003764 Firm Name: A WILCO ELECTRIC LLC
Firm Phone: 212-966-0564  Firm Address: 5782 BROADWAY BRONX NY 10463 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $92.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: S.W.MANAGEMENT LLC
Authorized Representative:  MARTIN BLUM
Relationship To Owner:   PATNER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  3#6 AWG
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  1  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS               
Buildings Total                 
Total Units : 5 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  PANEL,RISER,2 GFI'S,A/C,CARBON/SMOKE COMBO

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y156339
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/14/2011 08/03/2011 EBA C (60) (0) Y
INSPECTION COMMENTS: C




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back