![]() |
![]() ![]() |
|
NYC Department of Buildings | ||
Electrical Application Details for App #: Y155433 |
Premises: 2600 CRESTON AVENUE BRONX | BIN: 2013828 Block: 3168 Lot: 11 |
DOB NOW: Inspections | |||||||||||
Application Completed and Certified |
Filed: | 2600 CRESTON AV | Census Tract: 401 | Health Area: 0900 | |
O/D | Admin Area: Y - BRONX | Inspection Area: F | ||
BRONX, NY 10468 | Community Board: 207 | |||
![]() | ![]() | ![]() | ![]() |
DOB Cross Street(s): EAST 192 STREET, EAST 193 STREET | |||
Status: C - JOB IS SIGNED OFF 01/07/2020 | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 04/21/2011 9:28 AM | |
Application Entered: 04/21/2011 | Job Start Date: 04/25/2011 | ||
Last Change: 01/07/2020 | Job End Date: 05/25/2011 |
![]() | ![]() | ![]() | ![]() |
Appointment Status: | |||
Last Inspection By: JOFFRE PENA On 06/18/2019 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 011917 | Licensee Name: | ALTAF H SYED-NAQVI | |
Firm: | 003528 | Firm Name: | ALSON ELEC'L CONTR. INC | |
Firm Phone: | 718-435-1677 | Firm Address: | 1253 ROCKAWAY AVENUE BROOKLYN NY 11236 |
Work Started or Filed by Others: YES | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $40.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ||
Building Used As: Z - Other | |||||||
Store / Other: C1-W. U. APTS | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | SARBJIT KAUR | ||||||
Owner Business Name: | P.J.B CONTRACTING INC | ||||||
Authorized Representative: S KULANDAI | |||||||
Relationship To Owner: F.R |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
SWK | 1 | 9 | ||||||||||
Buildings Total | 1 | 9 | ||||||||||
Total Units : 10 units |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
![]() | ![]() | ![]() | ![]() |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
![]() | ![]() | ![]() | ![]() |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: SIDE WALK SHED BRIDGE. 140 L.F. |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 06/18/2019 | 06/18/2019 | JRP | C | (25) | (0) | Y | |||
INSPECTION COMMENTS: | SIDEWALK SHED REMOVED |