| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y154547 | ||
| Premises: 5900 ARLINGTON AVENUE BRONX | BIN: 2086321 Block: 5953 Lot: 240 |
| Application Completed and Certified | ||
| Filed: | 5900 ARLINGTON AVE. | Census Tract: 3230 | Health Area: 0100 | |
| BASEMENT, ROOF, EXTERIOR | Admin Area: Y - BRONX | Inspection Area: H | ||
| BRONX, NY 10471 | Community Board: 208 | |||
| Special Place Name: BUILDING 3 | ||||
| DOB Cross Street(s): WEST 259 STREET, INDEPENDENCE AVENUE | |||
| Status: C - JOB IS SIGNED OFF 11/08/2013 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 02/07/2011 11:41 AM | |
| Application Entered: 02/07/2011 | Job Start Date: 02/14/2011 | ||
| Last Change: 11/08/2013 | Job End Date: 05/31/2011 | ||
| Appointment Status: | |||
| Last Inspection By: SCHIAVO, JAMES On 11/04/2013 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011355 | Licensee Name: | CARMINE L LIPPOLIS | |
| Firm: | 002775 | Firm Name: | LIPPOLIS ELECTRIC, INC. | |
| Firm Phone: | 718-892-4055 | Firm Address: | 4459 BRONX BOULEVARD BRONX NY 10470 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $605.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | SKYVIEW OWNERS CORP | ||||||
| Authorized Representative: JACK TIMLIN | |||||||
| Relationship To Owner: PROPERTY MANAGER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 20 | |||||||||||
| OSP | 2 | 3 | ||||||||||
| ROF | 2 | 2 | ||||||||||
| Buildings Total | 20 | 2 | 3 | |||||||||
| Total Units : 25 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 11/08/2013 | Notice: | 1 - FIRST NOTICE 06/15/2012 |
| Power Issued: | 11/08/2013 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: CO-GENERATION SYSTEM INSTALLATION | |||
|
|