BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y151754
Premises: 2676 GRAND CONCOURSE BRONX BIN: 2017133     Block: 3304   Lot: 20
   
Application Completed and Certified

Filed: 2676 GRAND CONCOURSE Census Tract:   403.02 Health Area:  0900
BSMT Admin Area:   Y - BRONX Inspection Area:   F
BRONX, NY 10458 Community Board:   207
DOB Cross Street(s):   EAST KINGSBRIDGE ROAD,    EAST 196 STREET
Status:   C - JOB IS SIGNED OFF 06/20/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/17/2010 10:32 AM
Application Entered:   06/17/2010 Job Start Date:   06/18/2010
Last Change:   06/20/2011 Job End Date:   06/26/2010
Appointment Status:   
Last Inspection By:   ASHMAN, K.       On     06/01/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011846 Licensee Name: WINSTON JOHN
Firm: 001795 Firm Name: HEAT-TIMER SERVICE CORP
Firm Phone: 212-481-2020  Firm Address: 79 ALEXANDER AVE STE 36-A BRONX NY 10454 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
8 - BOILER/BURNER WIRING
Total Fee:  $103.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MARIA NIKAC
Owner Business Name: MPN HOLDINGS I, LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  24 CKTS
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS  BSMT        13         
Buildings Total          13           
Total Units : 16 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRING OF BOILER DEG 63 AND RELATED EQUIPMENT.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y151754
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/01/2011 06/20/2011 KAS C (25) (0) Y
INSPECTION COMMENTS: C




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back