Electrical Application Details for App #: Y144228
Premises: 382 EAST 161 STREET BRONX BIN: 2001786     Block: 2407   Lot: 15
   
Application Completed and Certified

Filed: 382 E 161ST ST Census Tract:   141 Health Area:  3400
1ST FLOOR Admin Area:   Y - BRONX Inspection Area:   C
BRONX, NY 10451 Community Board:   203
Special Place Name:   COURTLANDT CORNERS SHANTY
DOB Cross Street(s):   COURTLANDT AVENUE,    MELROSE AVENUE
Status:   C - JOB IS SIGNED OFF 02/10/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/31/2008 12:08 PM
Application Entered:   10/31/2008 Job Start Date:   11/03/2008
Last Change:   02/10/2011 Job End Date:   11/03/2011
Appointment Status:   
Last Inspection By:   BANYA, E       On     01/21/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010191 Licensee Name: RONALD J SPIELER
Firm: 001367 Firm Name: SPIELER & RICCA ELEC'L CO
Firm Phone: 718-392-4100  Firm Address: 52-09 VAN DAM STREET L.I.C. NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
2 - TEMPORARY CONSTRUCTION
Total Fee:  $43.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   SHANTIES (IN STORE)
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ELIZA DATTA (OWNER'S REP.)
Owner Business Name: COURTLANDT CORNERS I ASSO
Authorized Representative:  ROBERT WIEDA
Relationship To Owner:   MONADNOCK CONST.PROJ.MGR.


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001    10                 
Buildings Total 10                    
Total Units : 22 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  #08034-TEMPORARY LIGHT & POWER FOR TEMPORARY CONSTRUCTION SHANTIES THAT WILL BE REMOVED IN THE FUTURE.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y144228
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/21/2011 02/10/2011 EBA C (182) (0) Y
INSPECTION COMMENTS: No Inspection Comments For This Application




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.