|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: Y141030 |
Premises: 951 BRUCKNER BOULEVARD BRONX | BIN: 2120358 Block: 2735 Lot: 42 |
Application Completed and Certified |
Filed: | 951 BRUCKNER BLVD | Census Tract: 89 | Health Area: 3700 | |
ENTIRE | Admin Area: Y - BRONX | Inspection Area: C | ||
BRONX, NY 10459 | Community Board: 202 | |||
Related Job Number: 201117576 | |||
DOB Cross Street(s): BARRETTO STREET, SHERIDAN BLVD NB EN HUNTS PT AV | |||
Status: C - JOB IS SIGNED OFF 12/08/2008 | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 03/23/2008 3:59 PM | |
Application Entered: 03/23/2008 | Job Start Date: 03/24/2008 | ||
Last Change: 12/08/2008 | Job End Date: 03/24/2009 |
Appointment Status: | |||
Last Inspection By: ROGALEWSKI, M On 11/20/2008 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 010765 | Licensee Name: | CESAR QUERY | |
Firm: | 002004 | Firm Name: | C.Q. ELECTR'L CONTRG CORP | |
Firm Phone: | 718-204-9255 | Firm Address: | 723 EAST 135TH STREET BRONX NY 10454 |
Work Started or Filed by Others: NO | ||||||||
Work Category: N - NEW BUILDING | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING 8 - BOILER/BURNER WIRING |
Total Fee: $596.25 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
This Job Regulated by the NYC Energy Conservation Code: |
Building Used As: L - Five Or More Family | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | JESUS RODRIGUEZ | ||||||
Owner Business Name: | 3429 3RD AVE. REALTY CORP | ||||||
Authorized Representative: JESUS RODRIGUEZ | |||||||
Relationship To Owner: PARTNER |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
Buildings Total | 50 | 120 | 15 | 40 | 50 | |||||||
Total Units : 275 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 4 | #4-Wire | 1 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 5 | - Removed Meters | 0 | = Total Meters | 5 |
Power Auth Flag: | I - ISSUED | Objection Flag: | |
Power Requested: | 03/23/2008 | Notice: | |
Power Issued: | 03/23/2008 | Response: |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: DOB-2K8-038 ENTIRE 5 APT. PLUS PLP |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 11/20/2008 | 11/24/2008 | MIR | C | (45) | (0) | ||||
INSPECTION COMMENTS: | C |