Premises: 3005 GRAND CONCOURSE BRONX BIN: 2017315     Block: 3310   Lot: 72
   
Application Completed and Certified

Filed: 3005 GRAND CONCOURSE Census Tract:   411 Health Area:  0420
- Admin Area:   Y - BRONX Inspection Area:   H
BRONX, NY 10468 Community Board:   207
DOB Cross Street(s):   EAST 201 STREET,    EAST 202 STREET
Status:   C - JOB IS SIGNED OFF 08/20/2008
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/26/2007 12:33 PM
Application Entered:   09/26/2007 Job Start Date:   09/28/2007
Last Change:   08/20/2008 Job End Date:   04/30/2008
Appointment Status:   
Last Inspection By:   ASHMAN, K.       On     08/14/2008      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011808 Licensee Name: JOSEPH ALAIMO
Firm: 003419 Firm Name: HESTER ELECTRICAL INC
Firm Phone: 212-334-6918  Firm Address: 18 ORCHARD STREET - 1ST FL NEW YORK NY 10002 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $180.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Commercial/Residential (2  Stores, 1 Apartments)
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: VARSHA D SHAN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  3  100A 1PH
B. 101 Up to 200 AMPS  1  200A 3PHS
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  1 SET OF #2W
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  1 SET OF #3/0W
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  12-24 POLE
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 10  20  10  10                
Total Units : 54 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 2 #4-Wire 2 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 09/26/2007 Notice:  
Power Issued: 09/26/2007 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y138431
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/14/2008 08/14/2008 KAS C E (60) (0)
INSPECTION COMMENTS: C