![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y137730 | ||
| Premises: 2348 CAMBRELENG AVENUE BRONX | BIN: 2012518 Block: 3089 Lot: 26 |
| Filed: | 2350 CAMBRELENG AV | Census Tract: 391 | Health Area: 1100 | |
| SIDEWALK | Admin Area: Y - BRONX | Inspection Area: I | ||
| BRONX, NY 10458 | Community Board: 206 | |||
| DOB Cross Street(s): EAST 183 STREET, CRESCENT AVENUE | |||
| Status: K - CLOSED/CANCELLED 02/02/2010 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 08/09/2007 7:14 AM | |
| Application Entered: 08/09/2007 | Job Start Date: 08/09/2007 | ||
| Last Change: 02/02/2010 | Job End Date: 08/09/2008 | ||
| Appointment Status: | |||
| Last Inspection By: GARY MCCALLA On 01/28/2010 | |||
| Field Disp: K - OK TO CANCEL | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010285 | Licensee Name: | GREGORY PAPANTONIOU | |
| Firm: | 003867 | Firm Name: | BOROWIDE ELECT'L CONTR'S | |
| Firm Phone: | 718-204-1347 | Firm Address: | 36-07 20TH AVENUE INC ASTORIA NY 11105 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
2 - TEMPORARY CONSTRUCTION |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | EVEREST SCAFFOLDING | ||||||
| Authorized Representative: JIMMY DOWNES | |||||||
| Relationship To Owner: CONTRACTOR | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 8 | |||||||||||
| Total Units : 8 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: TEMPORARY SHED LIGHTING | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 01/28/2010 | 02/02/2010 | GYM | K | (20) | (0) | ||||
| INSPECTION COMMENTS: | C | |||||||||