| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
1 |
|
| C. 201 Up to 600 AMPS |
3 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
59 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
6 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
53 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
4 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
2 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER BSMT TO 8FLS. ART 250.24 PANELS NEUTRAL BAR BONDED AFTER SS |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |
| |
| 002 |
( 40) |
LOCKNUTS ARE MISSING OR LOOSE BSMT BOILER DISC SW |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |
| |
| 003 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION ENTIRE/ LOAD CALCULATIOON |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |
| |
| 004 |
( 30) |
OUTLET BOXES ARE NOT SECURED ROOF/ JUCTION BOXES |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |
| |
| 005 |
( 7) |
EMT IS NOT PROPERLY SUPPORTED (TYPE:EMT) ROOF/ ALUMINUM TUBING |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |
| |
| 006 |
( 29) |
OUTLET BOXES ARE NOT COVERED 1 TO 8FLS/ ALL KITCHENS |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |
| |
| 007 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED 1 TO 8FLS/ APTS STOVES RECEPTS |
RSLV |
10/09/2008 |
10/22/2008 |
11/02/2008 |