Electrical Application Details for App #: Y131028
Premises: 932 SOUTHERN BOULEVARD BRONX BIN: 2005884     Block: 2735   Lot: 14
   
Application Completed and Certified

Filed: 932 SOUTHERN BLVD Census Tract:   89 Health Area:  3700
NONE Admin Area:   Y - BRONX Inspection Area:   C
BRONX, NY 10459 Community Board:   202
DOB Cross Street(s):   BARRETTO STREET,    EAST 163 STREET
Status:   C - JOB IS SIGNED OFF 12/14/2006
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   03/29/2006 Job Start Date:   04/01/2006
Last Change:   12/14/2006 Job End Date:   04/28/2006
Appointment Status:   
Last Inspection By:   ASHMAN, K.       On     12/07/2006      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 010275 Licensee Name: FRANK RAPPO
Firm: 001195 Firm Name: R & L SYSTEMS, INC.
Firm Phone: 718-397-5394  Firm Address: 37-20 56TH STREET WOODSIDE NY 11377 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
Total Fee:  $165.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   COMMERCIAL
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MICHAEL COHEN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  09/05/2006
Power Issued: Response: V - OBJ WAS REMOVED 09/25/2006

Follow-Up: K - (CLOSED)
Contractor's Comments:  DEVICE # 2FZ88

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y131028
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/28/2006 08/03/2006 EHD J (25) (0) Y
INSPECTION COMMENTS: ELEVATOR SHAFT CONTROL WIRING AND FIXT, OUTLET
 
(2) 08/30/2006 09/05/2006 GYM V (60) (4) Y
INSPECTION COMMENTS: CONTRACTOR NO SHOW
 
(3) 12/07/2006 12/14/2006 KAS C R (30) (0) Y
INSPECTION COMMENTS: CERT




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order