Electrical Application Details for App #: Y128340
Premises: 36 WEST GUN HILL ROAD BRONX BIN: 2017688     Block: 3324   Lot: 59
   
Application Completed and Certified

Filed: 36-38 W GUN HILL RD Census Tract:   421 Health Area:  0410
BASEMENT/BOILER Admin Area:   Y - BRONX Inspection Area:   H
BRONX, NY 10467 Community Board:   207
DOB Cross Street(s):   KNOX PLACE,    GATES PLACE
Status:   C - JOB IS SIGNED OFF 03/08/2007
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   08/30/2005 Job Start Date:   08/22/2005
Last Change:   03/08/2007 Job End Date:   09/05/2005
Appointment Status:   
Last Inspection By:   PETER CONTEY       On     02/27/2007      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011464 Licensee Name: THOMAS E JOCELYN III
Firm: 001324 Firm Name: SCIENTIFIC ELEC. CO. INC
Firm Phone: 718-320-2023  Firm Address: 1475 EAST 222ND STREET BRONX NY 10469 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
8 - BOILER/BURNER WIRING
Total Fee:  $52.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: F & M MGMT & WEISS REALTY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 3 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: C - CALL TO OFFICE 11/24/2006
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y128340
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/03/2005 10/11/2005 PC2 A (40) (4) Y
INSPECTION COMMENTS: NONE
 
(2) 12/14/2005 12/28/2005 EHD N (0) (0) Y
INSPECTION COMMENTS: NO SHOW
 
(3) 05/18/2006 05/24/2006 PC2 H X (20) (0) Y
INSPECTION COMMENTS: VIOLATION ARE NOT REMOVED @ THIS TIME
 
(4) 11/21/2006 11/24/2006 PC2 H X (70) (0) Y
INSPECTION COMMENTS: VIOLATION NOT REMOVED AT THIS TIME, ALSO THEY WERE EXPLAINED TO THE CONTRACTOR AT THE TIME OF INSPECTION
 
(5) 02/27/2007 03/08/2007 PC2 C R (10) (0) Y
INSPECTION COMMENTS: VIOLATION REWRITTEN TO OWNER WORK WAS NOT INSTALLED BY THIS CONTRACTO R