BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y125508
Premises: 399 EAST 160 STREET BRONX BIN: 2001790     Block: 2407   Lot: 25
   
Application Completed and Certified

Filed: 399 E 160 ST Census Tract:   141 Health Area:  3400
NONE Admin Area:   Y - BRONX Inspection Area:   C
BRONX, NY 10451 Community Board:   203
DOB Cross Street(s):   COURTLANDT AVENUE,    MELROSE AVENUE
Status:   C - JOB IS SIGNED OFF 11/02/2005
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   02/23/2005 Job Start Date:   02/10/2005
Last Change:   11/02/2005 Job End Date:   12/10/2005
Appointment Status:   
Last Inspection By:   GARY MCCALLA       On     09/22/2005      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011396 Licensee Name: SPIRO VALENTIS
Firm: 002831 Firm Name: VALENTIS ELECTRIC, INC.
Firm Phone: 718-726-0072  Firm Address: 32-21 58TH STREET WOODSIDE NY 11377 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $1,627.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: RAMONE ESCOBAR
Owner Business Name: MELROSE PROPERTIES INC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  23  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  2  
D. Over 250 MCM  2  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  25  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 165  310  40  110  625                
Total Units : 1250 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 26 #4-Wire 4 #10-Wire 0
Existing Meters 30 + New Meters 0 - Removed Meters 0 = Total Meters 30

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 02/23/2005 Notice:  
Power Issued: 02/23/2005 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  .REWIRE BUILDING 24.APTS & 2 STORES

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y125508
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/22/2005 09/26/2005 GYM C E (120) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order