| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
3 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
4 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(126) |
BASEMENT WATER MAIN GROUND NOT INSTALLED ON WATER MAIN (BASEMENT) 250.64, GEC WIRE IS NOT CONNECTED TO THE WATER MAIN. |
OPEN |
08/20/2025 |
08/20/2025 |
|
| |
| 002 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)210.4 2 POLE BREAKERS ARE NEEDED FOR MULTI CIRCUITS SHARING ANEUTRAL. |
OPEN |
08/20/2025 |
08/20/2025 |
|
| |
| 003 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)CONTRACTOR NEEDS TO FILE A NEW PERMIT ADD 4 COMBO 100 SERVICESWITCHES TO THE APPLICATION. |
OPEN |
08/20/2025 |
08/20/2025 |
|
| |
| 004 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)320.30 ARMORED CABLE COMING OUT OF ELECTRICAL PANELS NEED TO BESUPPORTED. |
OPEN |
08/20/2025 |
08/20/2025 |
|
| |
| 005 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT)200.6, THE NEUTRAL FOR MULTI THE CIRCUITS WIRES THAT IS ORANGE,NEEDS TO BE MADE INTO A WHITE WIRED NEUTRAL. |
OPEN |
08/20/2025 |
08/20/2025 |
|