BIS Menu  |  DOB Violations  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Y116716
Premises: 2960 GRAND CONCOURSE BRONX BIN: 2017192     Block: 3306   Lot: 11
   
Application Completed and Certified

Filed: 2960 GRAND CONCOURSE Census Tract:   413 Health Area:  0420
BOILER ROOM,BASEMENT Admin Area:   Y - BRONX Inspection Area:   H
BRONX, NY 10458 Community Board:   207
DOB Cross Street(s):   BEDFORD PARK BOULEVARD,    EAST 201 STREET
Status:   C - JOB IS SIGNED OFF 01/07/2004
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   08/08/2003 Job Start Date:   07/29/2003
Last Change:   01/07/2004 Job End Date:   07/29/2003
Appointment Status:   
Last Inspection By:   DORSAINVILLE, R       On     01/03/2004      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011752 Licensee Name: ELIEZER ITKIN
Firm: 003352 Firm Name: ITKIN ELECTRIC CORP.
Firm Phone: 718-220-2772  Firm Address: 2355 JEROME AVENUE BRONX NY 10468 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
8 - BOILER/BURNER WIRING
Total Fee:  $52.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   X
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:  
Owner / Occup: PETER ROMEO
Owner Business Name: ROMEO HEATING INC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y116716
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/01/2003 11/07/2003 HMC N (15) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 01/03/2004 01/07/2004 RID C (15) (0) Y
INSPECTION COMMENTS: No Inspection Comments For This Application




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  DOB Violations  |  Electrical Inspection Work Order  |  Back