Electrical Application Details for App #: Y112875
Premises: 990 OGDEN AVENUE BRONX BIN: 2003191     Block: 2511   Lot: 84
   

DOB NOW: Inspections


Filed: 990 OGDEN AV Census Tract:   189 Health Area:  3310
NONE Admin Area:   Y - BRONX Inspection Area:   E
BRONX, NY 10452 Community Board:   204
DOB Cross Street(s):   WEST 163 STREET,    WEST 164 STREET
Status:   E - ABANDONED 08/22/2025
Request Type:   P - PICK-UP eFiled:   NO
Application Entered:   11/26/2002 Job Start Date:  
Last Change:   08/22/2025 Job End Date:  
Appointment Status:   
Last Inspection By:   DORSAINVILLE, R       On     11/21/2002      
Field Disp:   W - ISSUE OBJECTION TO OWNER
Energize Recommendation:  
Objection Disposition:  

License #: Licensee Name: UNKNOWN
Firm: Firm Name: UNKNOWN
Firm Phone:   Firm Address:  

Work Started or Filed by Others: NO
Work Category:    Work To Be Done:   Total Fee:  $0.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: KAHN JOSEPH
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice: 1 - FIRST NOTICE 11/26/2002
Power Issued: Response:  

Follow-Up: V - OWNER OBJECTION 11/26/2002
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: Y112875
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/21/2002 11/26/2002 RID W (15) (1)
INSPECTION COMMENTS: 1)BRANCH CIRCUIT TO MIZ,RECT OUTLETS,SWS,SER PNLS SUB FDRS THIS IS NOT A FINAL INSPECTION (SEE THIS APPL Y111749)




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back