![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: Y022812 | ||
| Premises: 1130 COLGATE AVENUE BRONX | BIN: 2092814 Block: 3737 Lot: 18 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 1130 COLGATE AV | Census Tract: 52 | Health Area: 3020 | |
| NONE | Admin Area: Y - BRONX | Inspection Area: J | ||
| BRONX, NY 10472 | Community Board: 209 | |||
| DOB Cross Street(s): WATSON AVENUE, WESTCHESTER AVENUE | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 07/29/1988 | Job Start Date: 07/26/1988 | ||
| Last Change: 08/22/2025 | Job End Date: 08/26/1988 | ||
| Appointment Status: | |||
| Last Inspection By: ???????????????????????????????? On 01/04/1990 | |||
| Field Disp: A - OBJCTN ISSD: JOB COMPLETE | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 009593 | Licensee Name: | ROBERT GARCIA | |
| Firm: | 001256 | Firm Name: | ROBERT GARCIA ELECL CONT | |
| Firm Phone: | 718-993-6737 | Firm Address: | 500 TRINITY AVENUE, STE.1B CORP BRONX NY 10455 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $517.25 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: C - Three Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | COLGATE CONTRACTORS CORP | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 71 | 143 | 32 | 66 | 71 | |||||||
| Total Units : 383 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 12 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | V - OBJECTION(S) EXIST |
| Power Requested: | 08/04/1988 | Notice: | 1 - FIRST NOTICE 01/18/1990 |
| Power Issued: | 08/04/1988 | Response: |
| Follow-Up: | |||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 01/04/1990 | 01/18/1990 | GAT | A | E | (15) | (1) | |||
| INSPECTION COMMENTS: | *) CONTR ASSIST TO OPEN S.S | |||||||||