| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
1 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
1 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| SUB FEEDERS (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
8 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
8 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| |
| (1) |
06/26/1987 |
07/14/1987 |
OA1 |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (2) |
08/07/1987 |
08/21/1987 |
OA1 |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (3) |
09/18/1987 |
10/02/1987 |
OA1 |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (4) |
10/16/1987 |
11/17/1987 |
OA1 |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (5) |
12/15/1987 |
12/31/1987 |
ZB1 |
C |
|
E |
(20) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (6) |
03/11/1988 |
03/25/1988 |
FL1 |
A |
|
G |
(30) |
|
(3) |
|
| INSPECTION COMMENTS:
|
APTS 2E AND 4D NEVER COMPLETED
|
| |
| (7) |
04/29/1988 |
05/16/1988 |
ZB1 |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (8) |
06/10/1988 |
07/06/1988 |
ZB1 |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (9) |
08/31/1988 |
09/07/1988 |
CB1 |
H |
X |
G |
(60) |
|
(0) |
|
| INSPECTION COMMENTS:
|
WENT TO ATP 1E 2W 4E AND BSMT WATER GROUND NTO COMP TORE
|
| |
| (12) |
11/04/1988 |
11/10/1988 |
CB1 |
P |
|
|
(60) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (13) |
12/11/1989 |
12/26/1989 |
KCB |
H |
X |
G |
(75) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (14) |
02/15/1990 |
02/27/1990 |
JP1 |
N |
|
|
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
NONE
|
| |
| (15) |
12/03/1990 |
12/17/1990 |
SS1 |
V |
R |
B |
(95) |
|
(4) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (16) |
01/25/1991 |
01/29/1991 |
AR1 |
H |
X |
G |
(45) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (19) |
04/17/1991 |
04/24/1991 |
AR1 |
C |
R |
E |
(45) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|