Electrical Application Details for App #: R145823
Premises: 182 HEFFERNAN STREET STATEN ISLAND BIN: 5077021     Block: 5688   Lot: 57
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 182 HEFFERNAN ST Census Tract:   170.08 Health Area:  0800
ROOF/GROUND Admin Area:   R - STATEN ISLAND Inspection Area:   E
STATEN IS, NY 10312 Community Board:   503
DOB Cross Street(s):   END PLACE,    CHATHAM STREET
Status:   C - JOB IS SIGNED OFF 04/11/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  09/28/2015 7:58 AM
Application Entered:   09/28/2015 Job Start Date:   09/28/2015
Last Change:   04/11/2016 Job End Date:   10/30/2015
Appointment Status:   
Last Inspection By:   VAZQUEZ, LOUIS       On     03/31/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011068 Licensee Name: CARLOS BERGER
Firm: 003535 Firm Name: BERGER QUALITY ELEC'L CON
Firm Phone: 718-768-3300  Firm Address: 195 7TH AVENUE BROOKLYN NY 11215 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
E - SUSTAINABLE ENERGY - SOLAR
Total Fee:  $115.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   A - One Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: WILLIAM FABRIZIO
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  3  3-3#10
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  2  1 PHASE UP TO 20-1
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND                   
Buildings Total                     
Total Units : 5 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRE SOLAR SYSTEM AND REPLACE MAIN PANEL ONLY

 
Inspection Details
 

INSPECTION FOR APPLICATION #: R145823
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/31/2016 04/01/2016 LV1 C (20) (0) Y
INSPECTION COMMENTS: PASS