| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
2 |
2-60A |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
6 |
4-600A,2-400A |
| D. 601 Up to 1200 AMPS |
4 |
2-800A,2-1200A |
| E. Over 1200 AMPS |
5 |
1-3000A,3-2500A,1-1600A |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
22 |
22-VARIES |
| B. Over #2 to 1/0 |
22 |
22-VARIES |
| C. Over 1/0 to 250 MCM |
147 |
147-VARIES |
| D. Over 250 MCM |
154 |
154-VARIES |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
136 |
136@45-1 |
| C. 3 Phase Up to 225 AMPS |
38 |
24-100A,14-225A |
| D. 3 Phase Over 225 AMPS |
21 |
21-VARIES |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (ALL FLOORS)FIRE STOPS NOT PROVIDED FOR CONDUITS BETWEEN CINDER BLOCK WALLSWHERE OBSERVED. (300.21). |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 002 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL (BASEMENT)NEW REVISION REQUIRED AT TIME O F INSPECTION. (REINSPECT REQUIRED). |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 003 |
(999) |
OTHER (BASEMENT) 277/480 ROOF PUMP RACEWAY NOT BONDED. (SERV RM) |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 004 |
(999) |
OTHER (BASEMENT)110V ROOF PUMP S/S NEUTRAL NOT PROPERLY BONDED TO ENCLOSURE ASDESIGNED. (SERV RM). |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 005 |
(999) |
OTHER (CELLAR) 277/480 FP RIGID FEEDER NOT BONDED, NO BUSHING. |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 006 |
( 19) |
DEFECTIVE WIRING IS IN USE (PENTHOUSE) NEUTRAL CONDUCTOR ATTACHED ON GROUND BUSS IN PNL. |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 007 |
( 25) |
ARMORED CABLES ARE NOT PROPERLY TERMINATED (PENTHOUSE) BX IMPROPERLY TERMINATED IN APART. PNL. |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |
| |
| 008 |
( 27) |
ARMORED CABLES INSTALLED WITHOUT INSULATING BUSHINGS (PENTHOUSE) ARMOR CABLE MISSING BUSHINGS. |
RSLV |
02/22/2018 |
02/22/2018 |
05/09/2018 |