BIS Menu  |  Property Profile  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M404363
Premises: 565 BROOME STREET MANHATTAN BIN: 1089738     Block: 477   Lot: 35
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 100 VARICK ST Census Tract:   37
CELLAR & ROOF Admin Area:   M - MANHATTAN Inspection Area:   U
NEW YORK, NY 10013 Community Board:   102
Related Job Number:    121193234
DOB Cross Street(s):   WATTS STREET,    BROOME STREET
Status:   C - JOB IS SIGNED OFF 11/19/2019
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   11/20/2017 Job Start Date:   11/14/2017
Last Change:   11/19/2019 Job End Date:   11/14/2019
Appointment Status:   
Last Inspection By:   RACEWICZ, TOMASZ       On     11/18/2019      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 012022 Licensee Name: JOSEPH SORTINO
Firm: 003742 Firm Name: TOP SHELF ELECTRIC CORP
Firm Phone: 718-815-1700  Firm Address: 3917 AMBOY ROAD STATEN ISLAND NY 10308 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $2,380.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Commercial/Residential (4  Stores, 112 Apartments)
Special Cert Approval:  
Advisory Board Approval:   REQUIRED
Advisory Board Categories:      K - 1000 KVA SERVICE                            
Advisory Board Approval #:   54797     Submittal #: 16A0760  
Owner / Occup: ANTHONY ROBBSON
Owner Business Name: 100 VARICK LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  100A
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  1200A
E. Over 1200 AMPS  2  3500A,3000A,6000A,2-2000A
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  3  2-6AWG, 1-3AWG
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  7  5-3/0, 2-4/0
D. Over 250 MCM  12  2-350,4-400,5-500,1-600
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
ROF              400         
Buildings Total              400           
Total Units : 400 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 112 #4-Wire 2 #10-Wire 2
Existing Meters 0 + New Meters 116 - Removed Meters 0 = Total Meters 116

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 11/20/2017 Notice: 1 - FIRST NOTICE 09/09/2019
Power Issued: 11/20/2017 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SERVICE WORK ASSOCIATED WITH ADVISORY BOARD

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M404363
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/19/2019 07/19/2019 TOR V (140) (1)
INSPECTION COMMENTS: FAIL
 
(2) 08/14/2019 08/14/2019 TOR N (30) (0) Y
INSPECTION COMMENTS: FAIL
 
(3) 08/27/2019 08/28/2019 TOR H X (165) (0) Y
INSPECTION COMMENTS: FAIL NEED REV 5 JOB COMPLETED (NEED T-OUT INSPECTION)
 
(4) 09/06/2019 09/09/2019 TOR V R (75) (1)
INSPECTION COMMENTS: FAIL
 
(5) 11/18/2019 11/19/2019 TOR C R (42) (0)
INSPECTION COMMENTS: PASS

OBJECTION FOR APPLICATION #: M404363
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(ALL FLOORS)INSTALLATION NOT MATCHING APPROVED DRWG (FOOTPRINT EQP LOCATIONFUSES FEEDERS COOPER DETAIL T-OUT NEUTRAL LINKS GROUNDING(NEED T-OUTINSP)
RSLV 07/19/2019 07/19/2019 09/06/2019
 
002 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT)FUSES, NEED DRWG REV 5 FOR FOOTPRINT OF THE ELECTRICAL ROOM ,NEEDPARTITION FOR TRANSFORMER (LINE AND LOAD AT THE SAME CONDUIT BODY)GENERATOR SWITCHES FOR 4 W SYSTEM NEED PROPER GROUNDING ANDGENERATOR AS WELL (T-OUT INSP REQUIRED )
RSLV 09/06/2019 09/06/2019 11/18/2019



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Property Profile  |  Electrical Inspection Work Order  |  Back