| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
6 |
4#750KCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
38 |
400A |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (ALL FLOORS) HOTEL RECEPTACLES NOT PROPERLY GROUNDED 250.146 |
RSLV |
08/17/2019 |
08/17/2019 |
03/07/2020 |
| |
| 002 |
(999) |
OTHER (ALL FLOORS)LIGHTING JUNCTION BOXES WHERE M/C CABLE IS BEING USED ARE NOTPROPERLY GROUNDED 250.148C |
RSLV |
08/17/2019 |
08/17/2019 |
03/07/2020 |
| |
| 003 |
(999) |
OTHER (ALL FLOORS)LIGHTING FIXTURES NOT PROPERLY SUPPORTED IN SUSPENDED CEILINGS410.36B |
RSLV |
08/17/2019 |
08/17/2019 |
03/07/2020 |
| |
| 004 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (ALL FLOORS)ART. 110.3 20 AMP BREAKERS INSTALLED FOR EACH HVAC UNIT, NOMANUFACTORY NAME PLATES WITH UNIT RATING, LISTING, OR MODEL NUMBER |
OPEN |
03/07/2020 |
03/07/2020 |
|
| |
| 005 |
(272) |
EQUIPMENT GROUNDING CONDUCTOR NOT PROPERLY INSTALLED (ALL FLOORS) ART. 250. 148 CONTRACTOR USING PRE WIRED LEVITONRECEPTACLES, GROUND EQUIPMENT CONDUCTOR PROVIDED WITH DEVICE ISTAPED AND NOT TERMINATED TO METAL BOX, ALL ROOMS ALL RECEPTACLES,CONTRACTOR LIKE TO UPLOAD DOCUMENTS PROVING THIS IS RECOMMENDEDINSTALLATION METHOD BY MANUFACTURE |
RSLV |
03/07/2020 |
03/07/2020 |
03/11/2020 |
| |
| 006 |
(999) |
OTHER (ALL FLOORS)CONTRACTOR NEEDS TO CORRECT FILING, NO HVAC EQUIPMENT FILED, |
RSLV |
03/07/2020 |
03/07/2020 |
02/11/2021 |