| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
3 |
375.00 |
| B. Each Additional 10 Floors Or Less |
3 |
249.00 |
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 17) |
DEFECTIVE SWITCHES ARE IN USE (ROOF) 110.12(A) ELEVATOR DIS SW NOT ACCESSIBLE, SWITCH DOOR JAM. |
RSLV |
03/25/2019 |
03/25/2019 |
04/18/2019 |
| |
| 002 |
(302) |
ELEVATOR MOTORS/CONTROLLERS/ENCLOSURES NOT GROUNDED (ROOF) 620.81, EMR CONTROLLER NOT PROPERLY BOND, THRU-OUT. |
RSLV |
03/25/2019 |
03/25/2019 |
04/18/2019 |
| |
| 003 |
(999) |
OTHER (ROOF) 300.50, FMC ENCASE THRU CONCRETE FLOOR, ARE NOT SLEEVE. |
RSLV |
03/25/2019 |
03/25/2019 |
04/18/2019 |
| |
| 004 |
(999) |
OTHER (ROOF)110.16, ARCH FLASH NOT PROVIDED ELECTRICAL EQUIPMENT, THRU-OUT. |
RSLV |
03/25/2019 |
03/25/2019 |
04/18/2019 |