| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
59 |
28- 3#4, 31-4#2 |
| B. Over #2 to 1/0 |
1 |
1-4#1/0 |
| C. Over 1/0 to 250 MCM |
15 |
7-3#4/0, 8 - 3#250 |
| D. Over 250 MCM |
1 |
1-3#600, |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
67 |
59 - 100 , 1-150, 7-225 |
| D. 3 Phase Over 225 AMPS |
9 |
6-250, 2-400, 1-600 |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (FLOOR: 023) TEMPORARY WIRING IN USE ART. 590.3 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 002 |
(999) |
OTHER (FLOOR: 023) OPEN BOXES ART. 314.25 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 003 |
(999) |
OTHER (FLOOR: 023) BOXES SET BACK IN COMBUSTIBLE MATERIALS ART. 314.20 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 004 |
(999) |
OTHER (FLOOR: 024) BONDING NOT SUFFICIENT ON 250V PANELS ART. 250.97 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 005 |
(999) |
OTHER (FLOOR: 024)HANDLE TIES NOT PROVIDED FOR MULTI WIRE CIRCUITS ART. 210.4 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 006 |
(999) |
OTHER (FLOOR: 024)RECEPTACLES IN COMMERCIAL KITCHEN NOT GFCI PROTECTED ART. 210.8 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 007 |
(999) |
OTHER (FLOOR: 024) TEMPORARY WIRING IN USE ART. 590.3 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 008 |
(999) |
OTHER (FLOOR: 024)FIRE STOPPING NOT PROVIDED WHERE FLOOR PENETRATED ART. 300.21 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 009 |
(999) |
OTHER (FLOOR: 035) TEMPORARY CONSTRICTION WIRING IN USE ART. 590.3 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 010 |
(999) |
OTHER (FLOOR: 035)RECEPTACLE WITHIN 6' OF SINK NOT GFCI PROTECTED ART. 210.8 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 011 |
(999) |
OTHER (FLOOR: 035)RECEPTACLES IN COMMERCIAL KITCHEN NOT GFCI PROTECTED ART. 210.8 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 012 |
(999) |
OTHER (FLOOR: 035)HANDLE TIES NOT PROVIDED FOR MULTI WIRE CIRCUITS ART. 210.4 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 013 |
(999) |
OTHER (FLOOR: 035)HI HATS NOT PROPERLY SUPPORTED ON SUSPENDED CEILING ART. 410.30 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 014 |
(999) |
OTHER (FLOOR: 036) BUSHING MISSING IN THE PANEL ART. 300.4 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 015 |
(999) |
OTHER (FLOOR: 036) HANDLE TIES MISSING FOR MULTI WIRE CIRCUITS ART. 210.4 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |
| |
| 016 |
(999) |
OTHER (FLOOR: 036) HI HATS NOT SECURED ON SUSPENDED CEILING ART. 410.30 |
RSLV |
03/05/2019 |
03/05/2019 |
04/26/2019 |