![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M399643 | ||
| Premises: 35 COOPER SQUARE MANHATTAN | BIN: 1090311 Block: 461 Lot: 8 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 200 E 6TH ST | Census Tract: 38 | Health Area: 6500 | |
| BASEMENT | Admin Area: M - MANHATTAN | Inspection Area: T | ||
| NEW YORK, NY 10003 | Community Board: 103 | |||
| DOB Cross Street(s): COOPER SQUARE, TARAS SHEVCHENKO PLACE | |||
| Status: C - JOB IS SIGNED OFF 10/16/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 08/03/2017 2:52 PM | |
| Application Entered: 08/03/2017 | Job Start Date: 08/03/2017 | ||
| Last Change: 10/16/2017 | Job End Date: 09/30/2017 | ||
| Appointment Status: | |||
| Last Inspection By: CONROY BLAKE On 10/16/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 012718 | Licensee Name: | JUAN F JIMENEZ | |
| Firm: | 004631 | Firm Name: | JAVELIN ELECTRIC INC | |
| Firm Phone: | 212-683-3500 | Firm Address: | 36-13 22ND STREET LONG ISLAND CITY NY 11106 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $85.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: K - Store | |||||||
| Store / Other: RETAIL | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ARUN I BHATIA | ||||||
| Owner Business Name: | COOPER & 6TH PROPERTY LLC | ||||||
| Authorized Representative: PAUL RATNOFSKY | |||||||
| Relationship To Owner: OWNER'S REPRESENTATIVE | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 1 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 08/03/2017 | Notice: | 1 - FIRST NOTICE 09/25/2017 |
| Power Issued: | 08/03/2017 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|