![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M396770 | ||
| Premises: 100 UNIVERSITY PLACE MANHATTAN | BIN: 1009386 Block: 570 Lot: 7503 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 21 E 12TH ST | Census Tract: 61 | Health Area: 5700 | |
| 110 UNIVERSITY PLACE | Admin Area: M - MANHATTAN | Inspection Area: S | ||
| NEW YORK, NY 10003 | Community Board: 102 | |||
| Special Place Name: 110 UNIVERSITY PLACE | ||||
| Related Job Number: 121187241 | |||
| DOB Cross Street(s): 5 AVENUE, UNIVERSITY PLACE | |||
| Status: C - JOB IS SIGNED OFF 08/17/2020 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 05/31/2017 5:06 PM | |
| Application Entered: 05/31/2017 | Job Start Date: 06/10/2017 | ||
| Last Change: 08/17/2020 | Job End Date: 12/30/2018 | ||
| Appointment Status: | |||
| Last Inspection By: ADAM ADAMSKI On 08/16/2020 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011819 | Licensee Name: | ROBERT A LOGOZIO | |
| Firm: | 003506 | Firm Name: | TEAM ELECTRIC, INC | |
| Firm Phone: | 212-685-8585 | Firm Address: | 20 WEST 36TH STREET, 10TH FL NEW YORK NY 10018 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: N - NEW BUILDING | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $352.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JAMES MIGILORE | ||||||
| Owner Business Name: | 21 EAST 12 LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| GND | 1 | 300 | ||||||||||
| Buildings Total | 300 | |||||||||||
| Total Units : 300 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: WIRING OF HOIST TRANSFORMERS AND DISCONNECTS. | |||
|
|