Electrical Application Details for App #: M393093
Premises: 626 5 AVENUE MANHATTAN BIN: 1083860     Block: 1266   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 45 ROCKEFELLER PLAZA Census Tract:   104 Health Area:  4800
28TH FLOOR Admin Area:   M - MANHATTAN Inspection Area:   L
NEW YORK, NY 10111 Community Board:   105
DOB Cross Street(s):   WEST 50 STREET,    WEST 51 STREET
Status:   C - JOB IS SIGNED OFF 10/28/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/07/2017 10:45 AM
Application Entered:   03/07/2017 Job Start Date:   03/07/2017
Last Change:   10/28/2017 Job End Date:   09/07/2017
Appointment Status:   
Last Inspection By:   URIM SYLA       On     08/04/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011835 Licensee Name: LAWRENCE J KROEZ
Firm: 004058 Firm Name: ABSOLUTE ELEC'L CONTRG OF
Firm Phone: 212-776-4049  Firm Address: 307 WEST 38TH STREET, ST#1301 NEW YORK NY 10018 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $53.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   O - Office Bldg
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: RCPI LANDMARK
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
028    29    29             
Buildings Total 29    29                
Total Units : 63 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M393093
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/04/2017 08/07/2017 UMS C (20) (0) Y
INSPECTION COMMENTS: INSTALLATION OF NEW LIGHTS IN HALLWAY. NO NEW BRANCH CIRCUITS




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.