Electrical Application Details for App #: M392835
Premises: 535 GREENWICH STREET MANHATTAN BIN: 1010366     Block: 597   Lot: 38
   

DOB NOW: Inspections


Filed: 535 GREENWICH ST Census Tract:   37 Health Area:  6800
VANDAM ST, CHARLTON ST Admin Area:   M - MANHATTAN Inspection Area:   U
NEW YORK, NY 10013 Community Board:   102
DOB Cross Street(s):   VANDAM STREET,    CHARLTON STREET
Status:   K - CLOSED/CANCELLED 12/03/2021
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/01/2017 12:14 PM
Application Entered:   03/01/2017 Job Start Date:   03/01/2017
Last Change:   12/03/2021 Job End Date:   03/01/2018
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:   SAMIR BASILLI       On     12/03/2021      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 010118 Licensee Name: ROBERT MARCHISOTTO
Firm: 002914 Firm Name: R.C.M. ELECTRIC CORP.
Firm Phone: 718-339-2680  Firm Address: 1915 MCDONALD AVE. BLDG REAR BROOKLYN NY 11223 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
Total Fee:  $165.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   W - School
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: TOM FROESE
Owner Business Name: ELJIN CONSTRUCTION OF NY
Authorized Representative:  TOM FROESE
Relationship To Owner:   OWNERS REP


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
EPT                       
Buildings Total                       
Total Units : 1 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M392835
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/03/2021 12/03/2021 SXB K (5) (0) Y
INSPECTION COMMENTS: PASS. NEW APP IS M00590181