Electrical Application Details for App #: M392705
Premises: 59 JANE STREET MANHATTAN BIN: 1011645     Block: 626   Lot: 12
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 61 JANE ST Census Tract:   79 Health Area:  6100
19G Admin Area:   M - MANHATTAN Inspection Area:   R
NEW YORK, NY 10014 Community Board:   102
DOB Cross Street(s):   HUDSON STREET,    GREENWICH STREET
Status:   C - JOB IS SIGNED OFF 10/22/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/27/2017 12:46 PM
Application Entered:   02/27/2017 Job Start Date:   02/28/2017
Last Change:   10/22/2018 Job End Date:   09/11/2017
Appointment Status:   
Last Inspection By:   VAZQUEZ, LOUIS       On     07/04/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012657 Licensee Name: ANTON NICAJ
Firm: 004495 Firm Name: ALL CITY ELECTRICAL INC
Firm Phone: 718-392-3200  Firm Address: 44-15 BARNETT AVENUE SUNNYSIDE NY 11104 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $55.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: JODI LEWIS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
019  19G                 
Buildings Total                   
Total Units : 12 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  REPLACE PANEL AND UPGRADE KITCHEN

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M392705
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/31/2018 06/01/2018 TOR N (15) (0) Y
INSPECTION COMMENTS: NO ACCESS CONTRACTOR PRESENT
 
(2) 07/04/2018 07/05/2018 LV1 C (105) (0) Y
INSPECTION COMMENTS: PASS