| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
3 |
|
| B. Each Additional 10 Floors Or Less |
3 |
|
| BOILER CONTROLS |
0 |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| |
| (1) |
05/25/2021 |
05/25/2021 |
STP |
J |
|
|
(30) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
CONTRACTOR DID NOT WANT TO DO INSPECTION. EMAIL SENT TO OFFICE.
|
| |
| (2) |
12/08/2022 |
12/08/2022 |
PHG |
J |
|
|
(20) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
INCOMPLETE CONTRACTOR SHOWED UP 10 MIN LATE LESS THAN 20 MIN ALLOCATED FULL INSPECT NEEDED
|
| |
| (3) |
12/27/2022 |
12/28/2022 |
VGV |
V |
|
|
(50) |
|
(2) |
|
| INSPECTION COMMENTS:
|
FAIL, INCOMPLETE, OBJECTIONS ISSUED. ONLY CHECKED CONTROLLERS AND DRIVES FOR CARS PE- 16/17 AND TOP OF SE- 5 . MAIN DISCONNECTS COULD NOT BE INSPECTED AT TIME OF INSPECTION.
|
| |
| (4) |
01/11/2023 |
01/11/2023 |
VGV |
J |
X |
|
(40) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
REMAINS INCOMPLETE, COULD NOT CHECK ANY ELEVATOR PITS OR TOPS OR PE16/17 OR SE5. ELEVATOR PE16 NOT IN SERVICE. FUSES ON MAIN LINE FOR PE17 COULD NOT BE CHECKED , CAR COULD NOT BE SHUT DOWN TO OPEN MAIN LINE. JOB IN PROGRESS. EXISTING OBJECTION FOR CONTROLLER BONDING REMAINS.
|
| |
| (5) |
02/21/2023 |
02/21/2023 |
TOR |
H |
X |
|
(20) |
|
(0) |
Y |
| INSPECTION COMMENTS:
|
FAIL CONTRACTOR RESCHEDULE NOT READY SEE OBJ
|
| |
| (6) |
03/03/2023 |
03/03/2023 |
LV1 |
C |
R |
|
(35) |
|
(0) |
|
| INSPECTION COMMENTS:
|
PASS. INSPECTION COMPLETE. REP ROB
|