![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M392072 | ||
| Premises: 565 BROOME STREET MANHATTAN | BIN: 1089738 Block: 477 Lot: 35 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 100 VARICK ST | Census Tract: 37 | Health Area: 6800 | |
| STREET | Admin Area: M - MANHATTAN | Inspection Area: U | ||
| NEW YORK, NY 10013 | Community Board: 102 | |||
| Special Place Name: SOUTH HOIST | ||||
| DOB Cross Street(s): WATTS STREET, BROOME STREET | |||
| Status: C - JOB IS SIGNED OFF 05/08/2019 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 02/10/2017 10:51 AM | |
| Application Entered: 02/10/2017 | Job Start Date: 02/10/2017 | ||
| Last Change: 05/08/2019 | Job End Date: 02/10/2019 | ||
| Appointment Status: | |||
| Last Inspection By: VAZQUEZ, LOUIS On 04/11/2019 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011681 | Licensee Name: | PAUL OLSEN | |
| Firm: | 004266 | Firm Name: | NASH ELECTRIC SERVICES IN | |
| Firm Phone: | 646-688-3350 | Firm Address: | 286 EAST 236TH STREET BRONX NY 10470 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
2 - TEMPORARY CONSTRUCTION 3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $380.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: HOIST | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | COLM COEN | ||||||
| Owner Business Name: | S&E BRIDGE & SCAFFOLD | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| SWK | 4 | |||||||||||
| Buildings Total | 4 | |||||||||||
| Total Units : 4 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: PERMIT FOR PERSONNEL/MATERIAL HOIST ONLY. (SOUTH HOIST). CONNECT FROM SECONDARY SIDE OF TRANSFORMER (SUPPLIED BY OTHERS) TO MATERIAL HOIST | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 04/11/2019 | 05/01/2019 | LV1 | C | (10) | (0) | Y | |||
| INSPECTION COMMENTS: | REMOVED | |||||||||