Electrical Application Details for App #: M389586
Premises: 1 BEEKMAN STREET MANHATTAN BIN: 1090476     Block: 90   Lot: 13
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 1 BEEKMAN ST Census Tract:   15.01 Health Area:  7700
SIDEWALK Admin Area:   M - MANHATTAN Inspection Area:   W
NEW YORK, NY 10038 Community Board:   101
Related Job Number:    121193546
DOB Cross Street(s):   PARK ROW,    THEATER ALLEY
Status:   C - JOB IS SIGNED OFF 01/13/2025
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  12/01/2016 2:40 PM
Application Entered:   12/01/2016 Job Start Date:   12/01/2016
Last Change:   01/13/2025 Job End Date:   12/01/2018
Appointment Status:   
Last Inspection By:   GORECKI GRZEGORZ       On     01/13/2025      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011161 Licensee Name: CHARLES DEGENNARO III
Firm: 004133 Firm Name: INNOVATIVE ELEC'L SVC LLC
Firm Phone: 718-655-5400  Firm Address: 3346 PROVOST AVENUE BRONX NY 10475 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
T - TEMPORARY LIGHT & POWER
Total Fee:  $265.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: RYAN FINN
Owner Business Name: T.G. NICKEL
Authorized Representative:  RYAN FINN
Relationship To Owner:   CONSTRUCTION MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  1  800A TRANS S
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 1 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 12/01/2016 Notice:  
Power Issued: 12/01/2016 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLATION OF 800A TRANS S COMBO SWITCH FOR TEMPORARY ELECTRICAL SERVICE

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M389586
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/13/2025 01/13/2025 GGC C (11) (0) Y
INSPECTION COMMENTS: PASS. INSPECTION COMPLETE. TEMPORARY SIDEWALK SERVICE REMOVED.