| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
28 |
20-100A; 8-228AMP |
| D. 3 Phase Over 225 AMPS |
2 |
1-400AMP; 1-600AMP |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 49) |
TEMPORARY OPEN WIRING INSTALLED IS NOT PROPERLY SUPPORTED (FLOOR: 002) TEMP WIRES |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 002 |
( 50) |
TEMPORARY OPEN WIRING IN CONTACT WITH PARTS OF THE BUILDING (FLOOR: 002) TEMP WIRES STILL ACTIVE 2, 10, FL & LOBBY. |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 003 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION (ALL FLOORS)FEEDER DIAGRAM REQUIRED FOR ALL NEW FEEDERS, NEW PANELS, NEW NEWHVAC UNITS |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 004 |
(999) |
OTHER (ALL FLOORS)PAA REQUIRED FOR 1, 700.30 TONS COOLING TOWER, 1, 5 TONS, 1, 8 TONS,1, 35 TONS HVAC UNITS, 5 500 MCM FEEDERS, 3, 3/0 FEEDERS, 2, HP 200MOTORS, 3, 5 HP MOTORS, 1, HANDICAP LIFT 1, 400 AMP PANEL. |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 005 |
( 24) |
ARMORED CABLES ARE NOT PROPERLY SECURED (BASEMENT) GYM |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 006 |
( 25) |
ARMORED CABLES ARE NOT PROPERLY TERMINATED (BASEMENT) GYM |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 007 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL (CELLAR) CONTRACTOR REPLACE FUSES DP-C-2 110.2 |
RSLV |
05/04/2019 |
05/04/2019 |
11/21/2019 |
| |
| 008 |
( 49) |
TEMPORARY OPEN WIRING INSTALLED IS NOT PROPERLY SUPPORTED (ALL FLOORS) T-OUT |
RSLV |
11/21/2019 |
11/21/2019 |
12/20/2019 |
| |
| 009 |
( 50) |
TEMPORARY OPEN WIRING IN CONTACT WITH PARTS OF THE BUILDING (ALL FLOORS) 2 ,10, LOBBY TEMPS IN USE T-OUT |
RSLV |
11/21/2019 |
11/21/2019 |
12/20/2019 |