![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M387939 | ||
| Premises: 150 EAST 23 STREET MANHATTAN | BIN: 1090665 Block: 878 Lot: 48 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 150 E 23 ST | Census Tract: 68 | Health Area: 5300 | |
| 1FL | Admin Area: M - MANHATTAN | Inspection Area: N | ||
| NEW YORK, NY 10010 | Community Board: 106 | |||
| Related Job Number: 121981748 | |||
| DOB Cross Street(s): LEXINGTON AVENUE, 3 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 10/12/2021 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/18/2016 6:33 PM | |
| Application Entered: 10/18/2016 | Job Start Date: 10/19/2016 | ||
| Last Change: 10/12/2021 | Job End Date: 10/19/2018 | ||
| Appointment Status: | |||
| Last Inspection By: GIUSEPPE IMBURGIA On 10/09/2021 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011793 | Licensee Name: | JEONG YUNG | |
| Firm: | 003404 | Firm Name: | INTELOGIC ELECTRIC, INC. | |
| Firm Phone: | 718-768-3188 | Firm Address: | 254 40TH STREET BROOKLYN NY 11232 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: N - NEW BUILDING | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 2 - TEMPORARY CONSTRUCTION T - TEMPORARY LIGHT & POWER |
Total Fee: $405.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | KENT CHENG | ||||||
| Owner Business Name: | LKH 23RD LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 20 | 10 | 6 | |||||||||
| 001 | 1-19 | 380 | 76 | |||||||||
| Buildings Total | 400 | 86 | 6 | |||||||||
| Total Units : 492 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 0 | + New Meters | 1 | - Removed Meters | 0 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 10/18/2016 | Notice: | |
| Power Issued: | 10/18/2016 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALL TEMP METERING EQUIPMENT, SWITCHES AND PANEL. INSTALL TEMP LIGHTING AND TEMP GFI OUTLETS FOR CONSTRUCTION. TEMP POWER FOR TEMP MECHANICAL EQUIPMENT. | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 10/09/2021 | 10/12/2021 | GIG | C | (45) | (0) | Y | |||
| INSPECTION COMMENTS: | TEMPS REMOVED | |||||||||