| NYC Department of Buildings | ||
| Electrical Application Details for App #: M387495 | ||
| Premises: 306 BLEECKER STREET MANHATTAN | BIN: 1010019 Block: 588 Lot: 24 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 306 BLEECKER ST | Census Tract: 73 | Health Area: 6400 | |
| BASEMENT, 2ND, 3RD, & 4TH FLR. | Admin Area: M - MANHATTAN | Inspection Area: R | ||
| NEW YORK, NY 10014 | Community Board: 102 | |||
| DOB Cross Street(s): BARROW STREET, GROVE STREET | |||
| Status: C - JOB IS SIGNED OFF 12/12/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/07/2016 4:33 PM | |
| Application Entered: 10/07/2016 | Job Start Date: 10/07/2016 | ||
| Last Change: 12/12/2017 | Job End Date: 10/07/2017 | ||
| Appointment Status: | |||
| Last Inspection By: ROBINSON HEATH On 12/11/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 012530 | Licensee Name: | HEMANCHAL DEONARINE | |
| Firm: | 004350 | Firm Name: | ELPO ELECTRICAL CONTG INC | |
| Firm Phone: | 718-384-6700 | Firm Address: | 50-03 METROPOLITAN AVE, SUITE B QUEENS NY 11385 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $393.25 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Commercial/Residential (1 Stores, 3 Apartments) | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | CALDWELL NANCY | ||||||
| Owner Business Name: | COURDON BLEECKER LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 002 | 2 | 8 | 25 | 2 | 10 | 8 | ||||||
| 003 | 3 | 10 | 20 | 1 | 15 | 10 | ||||||
| 004 | 4 | 9 | 22 | 2 | 12 | 9 | ||||||
| Buildings Total | 27 | 67 | 5 | 37 | 27 | |||||||
| Total Units : 163 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 4 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 5 | + New Meters | 5 | - Removed Meters | 5 | = Total Meters | 5 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 10/07/2016 | Notice: | 1 - FIRST NOTICE 11/13/2017 |
| Power Issued: | 10/07/2016 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: SUPERSEDE PERMITS M339506, M342184,M343619 & WIRING FOR NEW4TH FLOOR APARTMENT. INSTALLATION OF NEW 3-PHASE, 200AMP SERVICE, NEW POWER RISERS TO THREE APARTMENTS. NEW BRANCH WIRING. | |||
|
|