| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
1 |
100 AMP MB |
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 19) |
DEFECTIVE WIRING IS IN USE (FLOOR: 002) KITCHEN PLUG STRIP WIRED IN REVERSE 110.3 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 002 |
( 28) |
ELECTRICAL MATERIAL USED FOR LUMINAIRES HAS NOT BEEN APPROVED (FLOOR: 002) SHOWER TRIM PENDING APPROVAL 110.3 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 003 |
( 45) |
FIXTURE NOT INSTALLED IN AN APPROVED MANNER (FLOOR: 002) EXPOSED BULB IN CLOTHES CLOSET 410.16 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 004 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (FLOOR: 002)NEW POWER BLOCK INSTALLED IN OLD BACK BOX 314.28 110.3 376.56 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 005 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED (FLOOR: 002) AFCI NOT PROVIDED IN NEEDED AREAS 210.12 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 006 |
(999) |
OTHER (FLOOR: 002) FACE UP OUTLET IN BED ROOM 406.5 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 007 |
(999) |
OTHER (FLOOR: 002)LOAD CALCULATION NEEDED FOR NEW 100 AMP LINE(ALL TENETS HAVE 40AMPS) 220.40 |
RSLV |
07/26/2017 |
07/26/2017 |
08/23/2017 |
| |
| 008 |
(999) |
OTHER (FLOOR: 002) NEEDS 2 SHOWER TRIMS IN THE GUEST BATHROOM |
RSLV |
08/23/2017 |
08/23/2017 |
10/24/2017 |