BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M384603
Premises: 1041 PARK AVENUE MANHATTAN BIN: 1047951     Block: 1515   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 1045 PARK AV Census Tract:   148.02 Health Area:  3600
BASEMENT METER ROOM +OUT SIDE Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10028 Community Board:   108
DOB Cross Street(s):   EAST 86 STREET,    EAST 87 STREET
Status:   C - JOB IS SIGNED OFF 01/19/2018
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/27/2016 5:26 PM
Application Entered:   07/27/2016 Job Start Date:   07/28/2016
Last Change:   01/19/2018 Job End Date:   12/30/2016
Appointment Status:   
Last Inspection By:   GANITIS, PHILLIP       On     01/18/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010426 Licensee Name: SILVANO KINKELA
Firm: 004076 Firm Name: MIDWAY ELECTRIC CORP
Firm Phone: 718-389-0970  Firm Address: 273 RUSSELL STREET BROOKLYN NY 11222 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $85.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: DANIEL/ / NICKY SHATZ
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  1 SET 3/0 4WIRE
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 0
Existing Meters 1 + New Meters 1 - Removed Meters 1 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 07/27/2016 Notice:  
Power Issued: 07/27/2016 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M384603
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/18/2018 01/19/2018 PHG C (35) (0) Y
INSPECTION COMMENTS: FOR APT BRANCH WIRING AND PANELS REFER TO APP M376515




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order