![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M383203 | ||
| Premises: 321 EAST 61 STREET MANHATTAN | BIN: 1090704 Block: 1436 Lot: 13 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 328 E. 62 ST | Census Tract: 110 | Health Area: 4900 | |
| YARD | Admin Area: M - MANHATTAN | Inspection Area: M | ||
| NEW YORK, NY 10065 | Community Board: 108 | |||
| DOB Cross Street(s): PEDESTRIAN AND BIKE PATH LINK, 1 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 03/18/2020 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 06/23/2016 1:21 PM | |
| Application Entered: 06/23/2016 | Job Start Date: 06/23/2016 | ||
| Last Change: 03/18/2020 | Job End Date: 06/23/2019 | ||
| Appointment Status: | |||
| Last Inspection By: CARLOS CARDONA On 03/16/2020 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010996 | Licensee Name: | YITZCHAK GELB | |
| Firm: | 003314 | Firm Name: | CHAIM ELEC. CORPORATION | |
| Firm Phone: | 718-677-1040 | Firm Address: | 2920 AVENUE J BROOKLYN NY 11210 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY T - TEMPORARY LIGHT & POWER |
Total Fee: $441.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | CARMINE NICOLETTA | ||||||
| Owner Business Name: | JOY CONSTRUCTION | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| GND | 4 | 1 | 150 | |||||||||
| Buildings Total | 4 | 150 | ||||||||||
| Total Units : 154 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 0 | + New Meters | 1 | - Removed Meters | 0 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 06/23/2016 | Notice: | |
| Power Issued: | 06/23/2016 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: 800A TEMPORARY CONSTRUCTION SERVICE/DISTRIBUTION. | |||
|
|