| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
1 |
100 AMP |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (FLOOR: 006)CABINET LIGHTS NO ACCESS TO THE TRANSFORMERS ART. 410.144 |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 002 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (FLOOR: 006) PANEL NOT TO MOUNTED OVER STEPS ART. 110.26, 240.24F |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 003 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (FLOOR: 006) BOX SET BACK T-OUT ART. 314.20 |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 004 |
( 25) |
ARMORED CABLES ARE NOT PROPERLY TERMINATED (FLOOR: 006)BATHROOM MIRRORS EXPOSE WIRE ART. 320.40, 320.15, 300.15 |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 005 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (FLOOR: 006) PANEL DIRECTORY NEEDS UPDATES ART.408.4 |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 006 |
( 53) |
GFCI HAS NOT BEEN PROVIDED (FLOOR: 006) BATHROOM GFCI NOT PROVIDED ART 210.8 |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 007 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED (FLOOR: 006)AFCI NOT PROVIDED FOR ALL LISTED AREAS T-OUT ART. 210.12B |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 008 |
(999) |
OTHER (FLOOR: 006)APP NOT MATCH INSTALLATION (CONTRACTOR NEEDS TO OPEN NEW APP ) |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 009 |
(999) |
OTHER (FLOOR: 006)AFFIDAVIT FOR ALL KITCHEN APPLIANCES ART. 250.122, 250.146, 320.40,320.15, 110.2 |
RSLV |
11/09/2021 |
11/09/2021 |
02/03/2022 |
| |
| 010 |
(999) |
OTHER (FLOOR: 006)APT. 6L CONTRACTOR NEEDS AFFIDAVIT FOR ALL KITCHEN APPLIANCES ART.250.122,250.146,320.40,320.15 AND 110.2. |
RSLV |
02/03/2022 |
02/03/2022 |
02/23/2022 |
| |
| 011 |
(999) |
OTHER (FLOOR: 006)APT. 6L PAA REQUIRED, CONTRACTOR NEEDS TO ADD 23 FIXTURES FOR ATOTAL OF 37,ADD 8 RECEPTACLES FOR A TOTAL OF 24 AND ADD 7 SWITCHESFOR A TOTAL OF 17. |
RSLV |
02/03/2022 |
02/03/2022 |
02/23/2022 |