| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
2 |
1 X 400AMP, 1 X 600AMP |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
13 |
42 CIRCUITS, 225 AMP |
| D. 3 Phase Over 225 AMPS |
1 |
6 POLE 600 AMP |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(146) |
APPLIANCE DISCONNECT NOT PROPERLY LOCATED/LOCKABLE (FLOOR: 002) TOWEL WARMER NEED LOCKABLE DISCONNECT. |
RSLV |
06/06/2018 |
06/06/2018 |
06/20/2018 |
| |
| 002 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE (BASEMENT) FIRE PUMP SERVICE SWITCH NOT PROPERLY LABELED. |
RSLV |
06/06/2018 |
06/06/2018 |
06/20/2018 |
| |
| 003 |
(146) |
APPLIANCE DISCONNECT NOT PROPERLY LOCATED/LOCKABLE (BASEMENT) DISCONNECT NEEDED FOR SAUNA. |
RSLV |
06/06/2018 |
06/06/2018 |
06/20/2018 |
| |
| 004 |
(218) |
UNAPPROVED FIXTURES INSTALLED IN ALL CLOTHES CLOSETS (BASEMENT) FEEDER FOR LUTRON PANELS IN SAME TROUGH WITH CAT5. |
RSLV |
06/06/2018 |
06/06/2018 |
06/20/2018 |
| |
| 005 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT) FIRE PUMP SERVICE SWITCH NOT GROUNDED AND BONDED. |
RSLV |
06/06/2018 |
06/06/2018 |
06/20/2018 |
| |
| 006 |
(999) |
OTHER (BASEMENT) FIRE PUMP OVER-FUSED. AM. 695.4 |
RSLV |
06/06/2018 |
06/06/2018 |
06/20/2018 |
| |
| 007 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (BASEMENT)250.4(A)(4), CONTRACTOR TO INSTALL MIGB IN ELEVATOR DISCONNECT. |
RSLV |
06/20/2018 |
06/20/2018 |
07/03/2018 |
| |
| 008 |
( 14) |
CIRCUIT OVERCURRENT PROTECTION DEVICE IS OF IMPROPER SIZE (BASEMENT) 240.3, ELEVATOR DISCONNECT ARE OVER FUSE |
RSLV |
06/20/2018 |
06/20/2018 |
07/03/2018 |