BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M378384
Premises: 115 ELIZABETH STREET MANHATTAN BIN: 1006931     Block: 470   Lot: 24
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 115 ELIZABETH ST Census Tract:   41 Health Area:  6800
APT 2A Admin Area:   M - MANHATTAN Inspection Area:   U
NEW YORK, NY 10013 Community Board:   102
DOB Cross Street(s):   GRAND STREET,    BROOME STREET
Status:   C - JOB IS SIGNED OFF 05/10/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/25/2016 5:42 PM
Application Entered:   02/25/2016 Job Start Date:   02/28/2016
Last Change:   05/10/2016 Job End Date:   02/28/2017
Appointment Status:   
Last Inspection By:   MODELFINO, CARL C       On     03/30/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 009303 Licensee Name: MELVIN KLEIN
Firm: 002811 Firm Name: HUDSON EAST ELEC'L, INC.
Firm Phone: 212-348-7772  Firm Address: 148 WEST 24TH STREET 6TH FL NEW YORK NY 10011 

Removal of ECB Violation(s): 35159503Y              
Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $60.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: AARON DANIELS
Owner Business Name: AD RE INVESTORS, INC.
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
002  12         
Buildings Total 12              
Total Units : 31 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRING OF THE APARTMENT INTERIOR

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M378384
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/30/2016 03/31/2016 MLF C (20) (0) Y
INSPECTION COMMENTS: CONTRACTOR REPLACED SHOWER LIGHT TRIM ,WITH TRIM SUITABLE FOR DAMP LOCATIONS UPON REQUEST




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order