| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
1 |
1-3000A |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
8 SETS OF 500 MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
1 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (BASEMENT)ART. 250.102 BONDING JUMPERS NOT INSTALLED ALL LOAD SIDE CONDUITS |
RSLV |
03/03/2020 |
03/03/2020 |
11/07/2020 |
| |
| 002 |
(128) |
NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH (BASEMENT) ART. 250.24 3000 AMP SECOND FUSE DISCONNECT SWITCH |
RSLV |
03/03/2020 |
03/03/2020 |
11/07/2020 |
| |
| 003 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT) ART. 250 SERVICE NOT PROPERLY GROUNDED |
RSLV |
03/03/2020 |
03/03/2020 |
11/07/2020 |
| |
| 004 |
(221) |
NOT INSTALLED PER ADVISORY BOARD DRAWING (BASEMENT)110.2 FUSE SIZES AND BUCKET SWITCH LOCATIONS NOT AS PER APPROVEDDRAWING |
RSLV |
03/03/2020 |
03/03/2020 |
11/07/2020 |
| |
| 005 |
(272) |
EQUIPMENT GROUNDING CONDUCTOR NOT PROPERLY INSTALLED (BASEMENT)TABLE 250.122 3000 AMP FEEDER GROUND CONDUCTORS UNDERSIZED |
RSLV |
03/03/2020 |
03/03/2020 |
11/07/2020 |
| |
| 006 |
(999) |
OTHER (BASEMENT)CONTRACTOR NEEDS TO CORRECT APPLICATION, SERVICE SWITCHES, FEEDERS,PANELS, FIRE PUMP |
RSLV |
03/03/2020 |
03/03/2020 |
11/07/2020 |