|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: M371902 |
Premises: 450 PARK AVENUE MANHATTAN | BIN: 1035780 Block: 1292 Lot: 37 |
Printable (PDF) version of this Permit | |||||||||||
DOB NOW: Inspections | |||||||||||
Filed: | 450 PARK AV | Census Tract: 112.02 | Health Area: 4800 | |
7TH | Admin Area: M - MANHATTAN | Inspection Area: L | ||
NEW YORK, NY 10022 | Community Board: 105 | |||
DOB Cross Street(s): EAST 56 STREET, EAST 57 STREET | |||
Status: I - AWAITING INSPECTION REQUEST | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 09/02/2015 7:49 AM | |
Application Entered: 09/02/2015 | Job Start Date: 09/02/2015 | ||
Last Change: 12/17/2015 | Job End Date: 12/31/2015 | ||
COMPLETION FEE WAS BILLED |
Appointment Status: | |||
Last Inspection By: GARY MCCALLA On 12/17/2015 | |||
Field Disp: J - JOB IN PROGRESS | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 012512 | Licensee Name: | WARREN BUBAK | |
Firm: | 003078 | Firm Name: | KNIGHT ELEC'L SERV. CORP. | |
Firm Phone: | 212-989-2333 | Firm Address: | 599 11TH AVENUE, 7TH FLOOR NEW YORK NY 10036 |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $68.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
Building Used As: O - Office Bldg | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | MICHELLE LANDON | ||||||
Owner Business Name: | JONES LANG LASALLE | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
007 | 8 | 4 | 110 | |||||||||
Buildings Total | 8 | 4 | 110 | |||||||||
Total Units : 122 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
Follow-Up: | |||
Contractor's Comments: MOCK UP |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
(1) | 12/17/2015 | 12/17/2015 | GYM | J | (65) | (0) | Y | |||
INSPECTION COMMENTS: | TEMPORARY FIXTURES. |