| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
4 #500 MCM |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
4- # 500MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
2 |
4- #1/0, 4-#2 |
| D. 3 Phase Over 225 AMPS |
1 |
4- #500MCM |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (ROOF) SERVICE RACEWAY NOT BONDED SMALLER THAN NEC 250.66 (250.80) |
RSLV |
09/28/2016 |
09/28/2016 |
03/16/2018 |
| |
| 002 |
(999) |
OTHER (ROOF) MAIN BONDING JUMPER MISSING FROM SS (250.92)(250.24) |
RSLV |
09/28/2016 |
09/28/2016 |
03/16/2018 |
| |
| 003 |
(999) |
OTHER (ROOF) NEUTRAL BONDED IN PANEL AFTER SS (250.24A5) |
RSLV |
09/28/2016 |
09/28/2016 |
12/01/2016 |
| |
| 004 |
(999) |
OTHER (ROOF)UTILITY MAN HOLE IS NOT ACCESSIBLE, BOTTOM STAIR IS BUILD ON MANHOLE COVER (110.73) |
RSLV |
09/28/2016 |
09/28/2016 |
03/01/2018 |
| |
| 005 |
( 53) |
GFCI HAS NOT BEEN PROVIDED (FLOOR: 001) NO GFCI PROVIDED NEXT TO PANTRY WATER FOUNTAIN 210.8 |
RSLV |
12/01/2016 |
12/01/2016 |
03/01/2018 |
| |
| 006 |
(136) |
GROUNDING ELECTRODE CONDUCTOR IS NOT CONTINUOUS (ROOF) NO METAL CONTACT FOR GEC PIPE IN TROUGH ON ROOF |
RSLV |
12/01/2016 |
12/01/2016 |
03/01/2018 |